I have followed this near enough without knowing (the dismantling schedule) but when it says “Remove split pin, unscrew slotted nut forming guide ball (done) and disengage retaining tube from ball pin seating by using spanner 1976-T “
What is involved when it say disengage retaining tube? Does that mean unscrew? Left or right or just wiggle?
The one tool I do not have is the 1976-T but I think I can manufacture one but still don’t know what I need to do with it 🙁